Thai Jurong Engineering Limited

Our Group of Companies

Industrial Plant Projects

SSM HOT - ROLLED MILL PROJECT

Industrial Plant Experience

Project Description

Thai Jurong Engineering Limited secured a contract from Mitsubishi Heavy Industry, Hiroshima for the erection of SSM Siam Strip Mill plant. The mill is considered the largest, most efficient and economical among the steel producing plants. The plant is capable of an annual capacity of 3 million tons on the production of Hot Rolled Coils.

Owner: Siam Strip Mill Public

Client: Mitsubishi Heavy Industry, Hiroshima

Scope of Works:
  • Hot Strip Mill
  • Continuous Caster Machinery
  • Water Treatment Plant
  • Electrical Arc Furnace
  • Piping
  • Painting
Execution Period:

June 1997 to April 1999

Details of ProjectClientCapacityScope of Work
Brilliant Manufacturing, Saraburi
Period: Oct 03 - Jun 04
Brilliant Manufacturing-Full turn-key, design and construct of new factory in Thailand
AsiaPet Continuous Polyester Plant, Lopburi
Period: May 02 - Oct 02
EETH-Utility piping and insulation erection
Optical Fiber Network For Langue - Pakbara, Satoon
Period: Nov 99 - Jan 01
Telephone Organization of Thailand-Supply and installation of optical fiber cables and auxiliary equipment
Local Cable Network for Khao-Phang, Suratthani
Period: Nov 99 - Jan 01
Telephone Organization of Thailand-Supply and installation of telephone optical fiber cables and auxiliary equipment
Had Yai Exchange, Songkla
Period: Oct 99 - Jun 01
Telephone Organization of Thailand-Supply and installation of telephone cables and auxiliary equipment
Telephone Network Synchronization System
Period: Oct 98 - Feb 99
Communication Authority of Thailand-Equipment supply and installation
Bangpakong Dam Gate Project, Chachoengsao
Period: Feb 98 - Mar 99
Irrigation Dept. MHI Yokohama-Mechanical & electrical installation of left gates, stop log
Rayong SSM Hot Strip Mill Project, Rayong
Period: Jun 97 - Apr 99
SSM MHI Hiroshima-Mechanical installation of electrical arc furnace, continuous caster machinery, hot strip mill and water treatment plant
200 T/Day Phuket Refuse Incineration Plant, Phuket
Period: Oct 96 - Oct 97
Public Work Dept ./ MHI Takasago200 Ton/DayMechanical, installation of complete plant equipment and BOP
Water Tanks for Wang Noi CCPP Phase I, Ayutthaya
Period: Jun 95 - Jul 96
EGAT MHI Takasago8 Nos.Fabrication & erection of 8 nos. water tanks